Letter to the Editor, Jackson Hole News & Guide, April 4, 2018
In an absurd case of putting the cart a (half) mile ahead of the horse, and in conflict with the comprehensive plan’s goal of “preserving and protecting the valley’s ecosystem,” Teton County commissioners have wasted their time and our tax dollars developing an memorandum of understanding with the Wyoming Department of Transportation to design and construct a Tribal Trails connector road. This half-mile, two-lane stretch of road connecting 2244 South Park Loop to Highway 22 would cost just over $6.8 million.
We at the Responsible Growth Coalition remain mystified by the commissioners’ continued breach of their fiduciary obligations to the county’s tax-paying residents.
The memorandum implies a high likelihood that the proposed connector will be approved. It ignores the commissioners’ prior promise to first complete the Cambridge Systematics traffic study, share its results with the public and proceed with Tribal Trails if — and only if — those results demonstrate compelling traffic benefits, particularly at the “Y,” and no viable alternatives to building the new road are available.
WYDOT’s recent upgrade of the “Y” has virtually eliminated its congestion. Induced demand generated by Tribal Trails’ added capacity would quickly offset its immediate benefit and restore the current equilibrium level of traffic, defeating the objective of “alleviating congestion.” In fact, there would be a permanent increase in car volume on our roads, whose contribution to air and noise pollution will come at great cost to the comprehensive plan’s mission.
It is also apparent that the project, were it justified, should not be single-sourced to WYDOT, but rather subject to a competitive bidding process, to obtain valuable information on road construction costs and identify more qualified contractors. Indeed, according to County Engineer Sean O’Malley, a single-source arrangement is unprecedented. More concerning is that WYDOT, by its own admission, has no experience building local county roads. This is demonstrated in its price quote, which is almost double what it was last year when Tribal Trails was proposed as a specific purpose excise tax initiative and over four times the cost cited in public sources. Here is a link to such a source: TinyURL.com/timsylvester.
The issues raised above justify voting against the approval of the memorandum on April 10. The traffic study must be completed first, and if its results justify building the connector, then a competitive request-for-proposals process should be undertaken, soliciting no less than three qualified road contractors (in addition to WYDOT).
Otherwise, the only plausible explanation for insisting on this memorandum (and Tribal Trails in general) now is certain commissioners’ pro-growth agenda and their desire for a development corridor in South Park.
Geoff Gottlieb
Jackson